Installing a new bathroom suite takes time, so you need to understand how much disruption is involved for Stoke-on-Trent property if you have to make alternative arrangements. A realistic timeframe for completing the bathroom installation will help create reasonable expectations and mitigate stress.

What are you installing?

Understanding and itemising the features your new bathroom will include is the simplest way to calculate the length of time it will take. The more elements you incorporate into the design, the longer the installation will be.

Is new plumbing needed?

If you are adjusting the position of your bathroom suite or adding in a shower, you may need to hire a plumber to install new pipe work. It may also mean you have to retile completely. These aspects of installation can be lengthy, so detailed planning is crucial.

How long does it take to fit a bath and shower?

A bath is usually a relatively quick installation. The tiles and taps are features that can take a decent portion of time to finish. Before installing the tub, the old tiles need to be removed, the wall prepared, and new tiles fitted. On average, a shower tray takes about eight hours to fit, but again, the additional tiling and plumbing work will take longer.

How long does it take to fit the tiles?

Floor and wall tiles generally take around six hours to install, but ensuring the grouting is expertly applied takes time. Equally, if there are a lot of tricky cuts required, the process can be even longer. Overall, if you have a new bathroom suite in Stoke-on-Trent, you should allow up to a week for the work depending on how complex the installation is.